Since the end of June 2003, visitors to Croatia traveling by car to the coast
can get to their destinations faster and easier. The first sections of the new
motorways that are being built according to the Government's intensive
motorway plan, decided upon in 2001, have been opened. In order to get to your
destination easier and faster, find out the sections' names and when they were
opened. We urge you to pay special attention to critical points. We wish you a
pleasant journey!
The most important section is definitely the one leading towards the south.
The Gornja Ploca-Zadar II along with the recently built Udbina-Gornja Ploca
state road makes traveling from Zagreb to Zadar 90 minutes shorter. The most
significant part of this section is 5.670 meter long Sv. Rok tunnel.
2 other sections on the Rijeka-Zagreb and Zagreb-Split motorways (Vukova
Gorica-Bosiljevo I and Bosiljevo I - Mala Kapela) have also been opened,
totaling 46 km. Taking into consideration the Vrbovsko-Kupjak section on the
Rijeka-Zagreb motorway, a journey from Zagreb to Rijeka takes on average up to
2 hours.
In 2003, 150 km of new motorway sections will be opened in Croatia,
while Croatian Motorways Company (HAC) will re-asphalt 100 km of existing
motorways out of 200 km that need to be repaired. By 2005, Croatia will have a
total of 1365 kilometers of motorways. The construction of the Zagreb-Split
motorway should be finished by 2005, while the motorway to Dubrovnik is
expected to be finished by 2008.
A6 RIJEKA-ZAGREB MOTORWAY
VRBOVSKO - KUPJAK SEMI-MOTORWAY SECTION
Length of the Vrbovsko - Kupjak section amounts to 17,76 km
and was opened on 26.06.2003.
A1 ZAGREB - SPLIT MOTORWAY
VUKOVA GORICA - BOSILJEVO 1 SECTION
Length of the Vukova Gorica-Boslijevo I section amounts to 6,15 km
and was opened on 29.06.2003.
BOSILJEVO I -MALA KAPELA TUNNEL SECTION
Length of the Bosiljevo I - Josip dol - Mala Kapela tunnel section
amounts to approximately 36 km
and was opened on 30.06.2003.
GORNJA PLOCA-ZADAR II SECTION
Length of the Gornja Ploca-Zadar II section amounts to 59,8 km
and was opened on 30.06.2003
A4 ZAGREB - GORICAN MOTORWAY
BREZNICKI HUM - NOVI MAROF SECTION
Length of the Breznicki Hum - Novi Marof section amounts to 9,5 km
and was opened on 24.06.2003.
NOVI MAROF - VARAZDIN SECTION
Length of the Novi Marof-Varazdin section amounts to 13,64 km
and its construction should be completed by 30.11.2003.
MOTORWAY CRITICAL POINTS
We kindly urge drivers to observe traffic signs and to drive
within speed limits in order to avoid traffic accidents.
ZAGREB-SPLIT MOTORWAY
The critical point is Sv. Rok tunnel, where
the road is two-lane, meaning that it changes from a four-lane motorway to a
two-lane semi-motorway, having one lane for each direction. After exiting the
southern side of Sv. Rok tunnel, there are some 4 kilometers of straight road
towards Maslenica. After exiting Celinka tunnel (third in a row when traveling
from Zagreb), there is a large curve and afterwards (after two kilometers and
Baricevic viaduct) a sharp right curve. From Sv. Rok tunnel to the sharp curve
after Baricevic viaduct, the speed limit is 80 kilometers per hour. We urge
drivers to obey the speed limit not only due to the road configuration but
also due to strong and sudden winds (Bura wind) common in the area.
RIJEKA-ZAGREB MOTORWAY The critical points on the
Vrbovsko-Kupjak section of the Rijeka-Zagreb motorway are some 100 meters
before Cardak tunnel, where the motorway turns into a
two-lane road, as well as when exiting Pod Vugles tunnel and
entering Javorova Kosa tunnel that are only some sixty meters
apart.
MORE INFORMATION: A map of Croatia's motorway network
can be found atwww.mppv.hr .
ROAD, BRIDGE AND TUNNEL TOLL RATES IN THE REPUBLIC OF CROATIA.
SOURCE: JUTARNJI LIST NEWSPAPER
|
A1 MOTORWAY ZAGREB - VUKOVA GORICA |
| ZAGREB (LUCKO) |
EXIT |
JASTRE- JARSKO |
KARLOVAC |
VUKOVA GORICA |
| I |
 |
8,00 kn |
16,00 kn |
27,00 kn |
|
A1 MOTORWAY BOSILJEVO-TUNEL MALA KAPELA |
| I |
 |
10,00 kn |
|
A1 MOTORWAY CVOR GORNJA PLOCA-ZADAR 2 |
| I |
 |
20,00 kn |
|
A2 MOTORWAY ZAPRESIC - KRAPINA |
| I |
 |
10,00 kn |
|
A3 MOTORWAY ZAGREB - BREGANA |
| I |
 |
5,00 kn |
|
A4 MOTORWAY POPOVEC - NOVI MAROF |
| I |
 |
10,00 kn |
|
A4 MOTORWAY VARAZDIN - GORICAN |
| I |
 |
10,00 kn |
|
A6 MOTORWAY RIJEKA - VRBOVSKO |
| RIJEKA |
EXIT |
OSTR- OVICA |
VRA- TA |
DEL- NICE |
RAVNA GORA |
VRBO- VSKA |
| I |
 |
7,00 kn |
11,00 kn |
14,00 kn |
18,00 kn |
23,00 kn |
|
KRCKI MOST |
| I |
 |
15,00 kn |
|
TUNNEL UCKA |
| I |
 |
26,00 kn |